Gap analyses of Work in progress BIM deliverables on the National Manufacturing Institute Scotland (NMIS) project at RIBA Stage 5
Fuente:
Zenodo
Saved in:
| Main Author: | |
|---|---|
| Format: | Recurso digital |
| Language: | English |
| Published: |
Zenodo
2022
|
| Subjects: | |
| Online Access: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1866902227966230528 |
|---|---|
| author | JUSTE, KAROLINA |
| author_facet | JUSTE, KAROLINA |
| contents | <p><strong>Original MSc dissertation submitted in August 2022 as part of the Master in Advanced Construction Technologies & BIM programme at University of Strathclyde.</strong><br>This version is shared in its original form, without amendments, to preserve academic integrity.The study investigates how the absence or poor definition of <strong>Information Requirements (IRs)</strong> impacts the delivery of <strong>BIM data for Facilities Management</strong>. It includes a practical <strong>BIM Audit</strong> of the <strong>National Manufacturing Institute Scotland (NMIS) project</strong>, analysing how real project data <strong>aligns or fails to align with expected BIM deliverables</strong>.</p> <p>The research provides clear, evidence based recommendations to improve client-side documentation, project setup, and alignment with <strong>ISO 19650 standards</strong> for future digital handovers.</p> |
| format | Recurso digital |
| id | zenodo_https___doi_org_10_5281_zenodo_15120694 |
| institution | Zenodo |
| language | eng |
| publishDate | 2022 |
| publisher | Zenodo |
| record_format | zenodo |
| spellingShingle | Gap analyses of Work in progress BIM deliverables on the National Manufacturing Institute Scotland (NMIS) project at RIBA Stage 5 JUSTE, KAROLINA BIM Facilities Management Information Requirements (IRs) ISO 19650 compliance Asset Information Requirements (AIR) Exchange Information Requirements (EIR) Asset Information Model (AIM) CAFM Digital Handover National Manufacturing Institute Scotland (NMIS) BIM for FM BIM Audit BIM Audit on a Live project BIM deliverables Audit Building Information Modelling (BIM) Digital Construction processes EIR & AIR importance <p><strong>Original MSc dissertation submitted in August 2022 as part of the Master in Advanced Construction Technologies & BIM programme at University of Strathclyde.</strong><br>This version is shared in its original form, without amendments, to preserve academic integrity.The study investigates how the absence or poor definition of <strong>Information Requirements (IRs)</strong> impacts the delivery of <strong>BIM data for Facilities Management</strong>. It includes a practical <strong>BIM Audit</strong> of the <strong>National Manufacturing Institute Scotland (NMIS) project</strong>, analysing how real project data <strong>aligns or fails to align with expected BIM deliverables</strong>.</p> <p>The research provides clear, evidence based recommendations to improve client-side documentation, project setup, and alignment with <strong>ISO 19650 standards</strong> for future digital handovers.</p> |
| title | Gap analyses of Work in progress BIM deliverables on the National Manufacturing Institute Scotland (NMIS) project at RIBA Stage 5 |
| topic | BIM Facilities Management Information Requirements (IRs) ISO 19650 compliance Asset Information Requirements (AIR) Exchange Information Requirements (EIR) Asset Information Model (AIM) CAFM Digital Handover National Manufacturing Institute Scotland (NMIS) BIM for FM BIM Audit BIM Audit on a Live project BIM deliverables Audit Building Information Modelling (BIM) Digital Construction processes EIR & AIR importance |
| url | https://doi.org/10.5281/zenodo.15120694 |