Saved in:
Bibliographic Details
Main Authors: Sayyidjabbor S.Sayyidqosimov, Abduboki M.Khakimov
Format: Recurso digital
Language:
Published: Zenodo 2025
Online Access:https://doi.org/10.5281/zenodo.15239390
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1866902257166974976
author Sayyidjabbor S.Sayyidqosimov
Abduboki M.Khakimov
author_facet Sayyidjabbor S.Sayyidqosimov
Abduboki M.Khakimov
contents <h2><strong><span>ABSTRACT </span></strong></h2> <p><span lang="UZ">This article discusses the updating of the work of a tunnel boring complex with a soil load "Herrenknecht" S-1128 during the excavation of distillation tunnels in difficult mining and geological conditions in the field of underground construction of the second stage of the Yunusabad line of the Tashkent metro. The article presents methods for creating technological schemes for carrying out subway tunnels, which make it possible to study the complex management of the processes of constructing the lining of a reinforced concrete ring with an internal diameter of 5,100 m for the construction of tunnels using TBMs in the difficult urban conditions of the city of Tashkent. The parameters of the last built ring and the area for entering the gap, a graphical representation of the selected next ring, information about the eccentricity of the last built ring and the pre-calculated eccentricity of the selected next ring are described. In addition, an indication of the current advance values and pre-calculated advance values taking into account the selected next ring is provided. An analysis technique is considered using the Tunis software - the module “Calculation of the ring installation sequence”.</span></p>
format Recurso digital
id zenodo_https___doi_org_10_5281_zenodo_15239390
institution Zenodo
language
publishDate 2025
publisher Zenodo
record_format zenodo
spellingShingle STRUCTURES OF PRECAST REINFORCED CONCRETE LININGS OF DISTILLING TUNNELS CONSTRUCTED BY THE SHIELD METHOD OF THE HERRENKNECHT COMPANY
Sayyidjabbor S.Sayyidqosimov
Abduboki M.Khakimov
<h2><strong><span>ABSTRACT </span></strong></h2> <p><span lang="UZ">This article discusses the updating of the work of a tunnel boring complex with a soil load "Herrenknecht" S-1128 during the excavation of distillation tunnels in difficult mining and geological conditions in the field of underground construction of the second stage of the Yunusabad line of the Tashkent metro. The article presents methods for creating technological schemes for carrying out subway tunnels, which make it possible to study the complex management of the processes of constructing the lining of a reinforced concrete ring with an internal diameter of 5,100 m for the construction of tunnels using TBMs in the difficult urban conditions of the city of Tashkent. The parameters of the last built ring and the area for entering the gap, a graphical representation of the selected next ring, information about the eccentricity of the last built ring and the pre-calculated eccentricity of the selected next ring are described. In addition, an indication of the current advance values and pre-calculated advance values taking into account the selected next ring is provided. An analysis technique is considered using the Tunis software - the module “Calculation of the ring installation sequence”.</span></p>
title STRUCTURES OF PRECAST REINFORCED CONCRETE LININGS OF DISTILLING TUNNELS CONSTRUCTED BY THE SHIELD METHOD OF THE HERRENKNECHT COMPANY
url https://doi.org/10.5281/zenodo.15239390