The source code of convergence curves

Fuente: Zenodo
Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Jiahang, Li, Xinyu, Li, Liang, Gao
Format: Recurso digital
Veröffentlicht: Zenodo 2025
Online-Zugang:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
_version_ 1866902220458426368
author Jiahang, Li
Xinyu, Li
Liang, Gao
author_facet Jiahang, Li
Xinyu, Li
Liang, Gao
contents <div> <div>% Developed in MATLAB R2023a</div> <div>% The source code of convergence curves in Ref. [1] and [2].</div> <div> </div> <div> </div> <div>% If this code is helpful to you, please cite Ref. [1] and [2].</div> <div> </div> <div> </div> <div> </div> <div>% [1] J. Li, Q. Liu, C. Wang, and X. Li, "A disjunctive graph-based metaheuristic</div> <div>% for flexible job-shop scheduling problems considering fixture shortages</div> <div>% in customized manufacturing systems,” Robotics and Computer-Integrated Manufacturing,</div> <div>% vol. 95, p. 102981, Oct. 2025, doi: 10.1016/j.rcim.2025.102981.</div> <div> </div> <div> </div> <div>% [2] J. Li, X. Li, L. Gao, and Q. Liu, “A Flexible Job Shop Scheduling Problem</div> <div>% Considering On-Site Machining Fixtures: A Case Study From Customized Manufacturing</div> <div>% Enterprise,” IEEE Transactions on Automation Science and Engineering,</div> <div>% vol. 22, pp. 8415–8426, 2025, doi: 10.1109/tase.2024.3485810</div> <div> </div> <div>Example: </div> <div> </div> <div></div> </div>
format Recurso digital
id zenodo_https___doi_org_10_5281_zenodo_15574784
institution Zenodo
language
publishDate 2025
publisher Zenodo
record_format zenodo
spellingShingle The source code of convergence curves
Jiahang, Li
Xinyu, Li
Liang, Gao
<div> <div>% Developed in MATLAB R2023a</div> <div>% The source code of convergence curves in Ref. [1] and [2].</div> <div> </div> <div> </div> <div>% If this code is helpful to you, please cite Ref. [1] and [2].</div> <div> </div> <div> </div> <div> </div> <div>% [1] J. Li, Q. Liu, C. Wang, and X. Li, "A disjunctive graph-based metaheuristic</div> <div>% for flexible job-shop scheduling problems considering fixture shortages</div> <div>% in customized manufacturing systems,” Robotics and Computer-Integrated Manufacturing,</div> <div>% vol. 95, p. 102981, Oct. 2025, doi: 10.1016/j.rcim.2025.102981.</div> <div> </div> <div> </div> <div>% [2] J. Li, X. Li, L. Gao, and Q. Liu, “A Flexible Job Shop Scheduling Problem</div> <div>% Considering On-Site Machining Fixtures: A Case Study From Customized Manufacturing</div> <div>% Enterprise,” IEEE Transactions on Automation Science and Engineering,</div> <div>% vol. 22, pp. 8415–8426, 2025, doi: 10.1109/tase.2024.3485810</div> <div> </div> <div>Example: </div> <div> </div> <div></div> </div>
title The source code of convergence curves
url https://doi.org/10.5281/zenodo.15574784