Salvato in:
Dettagli Bibliografici
Autori principali: Jiahang, Li, Xinyu, Li, Liang, Gao
Natura: Recurso digital
Lingua:
Pubblicazione: Zenodo 2025
Accesso online:https://doi.org/10.5281/zenodo.15574784
Tags: Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!
Sommario:
  • <div> <div>% Developed in MATLAB R2023a</div> <div>% The source code of convergence curves in Ref. [1] and [2].</div> <div> </div> <div> </div> <div>% If this code is helpful to you, please cite Ref. [1] and [2].</div> <div> </div> <div> </div> <div> </div> <div>% [1] J. Li, Q. Liu, C. Wang, and X. Li, "A disjunctive graph-based metaheuristic</div> <div>% for flexible job-shop scheduling problems considering fixture shortages</div> <div>% in customized manufacturing systems,” Robotics and Computer-Integrated Manufacturing,</div> <div>% vol. 95, p. 102981, Oct. 2025, doi: 10.1016/j.rcim.2025.102981.</div> <div> </div> <div> </div> <div>% [2] J. Li, X. Li, L. Gao, and Q. Liu, “A Flexible Job Shop Scheduling Problem</div> <div>% Considering On-Site Machining Fixtures: A Case Study From Customized Manufacturing</div> <div>% Enterprise,” IEEE Transactions on Automation Science and Engineering,</div> <div>% vol. 22, pp. 8415–8426, 2025, doi: 10.1109/tase.2024.3485810</div> <div> </div> <div>Example: </div> <div> </div> <div></div> </div>