Perturbations; EURAD-2 Domain Insight 4.2.1
Fuente:
Zenodo
Gespeichert in:
| 1. Verfasser: | |
|---|---|
| Format: | Recurso digital |
| Sprache: | Englisch |
| Veröffentlicht: |
Zenodo
2025
|
| Schlagworte: | |
| Online-Zugang: | |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| _version_ | 1866901691950956544 |
|---|---|
| author | Neeft, Erika |
| author_facet | Neeft, Erika |
| contents | <p>The roadmap describes typical programme goals, activities and capabilities needed against 7 themes, which are each further broken down into sub-themes and domains in what we can call the Goals Breakdown Structure (GBS). </p> <p><span>This document provides the overall goal for Perturbations (Characterize or confirm the chemical, hydrogeological, geomechanical, thermal, geomicrobiological, gaseous and radiation-induced perturbations which may be caused by facility construction, operations or closure and their impacts on long-term disposal system evolution), extracted from the EURAD Roadmap goals breakdown structure (GBS). This is supplemented by typical activities, according to phases of implementation, needed to achieve the domain goal. Activities are generic and are common to most regional and geological disposal programmes.</span></p> |
| format | Recurso digital |
| id | zenodo_https___doi_org_10_5281_zenodo_17454407 |
| institution | Zenodo |
| language | eng |
| publishDate | 2025 |
| publisher | Zenodo |
| record_format | zenodo |
| spellingShingle | Perturbations; EURAD-2 Domain Insight 4.2.1 Neeft, Erika natural barrier geological barrier host rock crystalline clay salt <p>The roadmap describes typical programme goals, activities and capabilities needed against 7 themes, which are each further broken down into sub-themes and domains in what we can call the Goals Breakdown Structure (GBS). </p> <p><span>This document provides the overall goal for Perturbations (Characterize or confirm the chemical, hydrogeological, geomechanical, thermal, geomicrobiological, gaseous and radiation-induced perturbations which may be caused by facility construction, operations or closure and their impacts on long-term disposal system evolution), extracted from the EURAD Roadmap goals breakdown structure (GBS). This is supplemented by typical activities, according to phases of implementation, needed to achieve the domain goal. Activities are generic and are common to most regional and geological disposal programmes.</span></p> |
| title | Perturbations; EURAD-2 Domain Insight 4.2.1 |
| topic | natural barrier geological barrier host rock crystalline clay salt |
| url | https://doi.org/10.5281/zenodo.17454407 |