Saved in:
| Main Author: | NEWAZ, M. N. |
|---|---|
| Format: | Recurso digital |
| Language: | |
| Published: |
Zenodo
2010
|
| Subjects: | |
| Online Access: | https://doi.org/10.5281/zenodo.17729447 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
Table 1 in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
by: NEWAZ, M. N.
Published: (2010)
by: NEWAZ, M. N.
Published: (2010)
Table 4.10 in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
by: NEWAZ, M. N.
Published: (2010)
by: NEWAZ, M. N.
Published: (2010)
Table- 1.3. List of Reptiles in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
by: NEWAZ, M. N.
Published: (2010)
by: NEWAZ, M. N.
Published: (2010)
Table- 1.4. List of Amphibians in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
by: NEWAZ, M. N.
Published: (2010)
by: NEWAZ, M. N.
Published: (2010)
Figure-2.1. Steps Involved in Environmental Clearance in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
by: NEWAZ, M. N.
Published: (2010)
by: NEWAZ, M. N.
Published: (2010)
Table- 2.1. Air and noise emission levels as specified in Table- 6 (B), page 21 of WB EHS- 2008 (in mg / Mm 3 or as indicated) in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
by: NEWAZ, M. N.
Published: (2010)
by: NEWAZ, M. N.
Published: (2010)
IMPACT OF ISOLATED AND COMBINED RESISTANCE TRAINING AND PLYOMETRIC TRAINING ON STRENGTH AND POWER OUTPUTS
by: V.A Shafeeq
Published: (2013)
by: V.A Shafeeq
Published: (2013)
WORLD BANK
Published: (2024)
Published: (2024)
INDUSTRIES AND ENVIRONMENTAL IMPACT ASSESSMENT: ANALYSIS OF THE SCREENING PROCESS IN ARGENTINA
by: Agustina Barilari
Published: (2020)
by: Agustina Barilari
Published: (2020)
THE IMPACT OF IT GOVERNANCE ON IT PROJECTS -THE CASE OF THE GHANA RURAL BANK COMPUTERIZATION AND INTER-CONNECTIVITY PROJECT
by: William Allassani
Published: (2013)
by: William Allassani
Published: (2013)
WORLD BANK: New Loans
Published: (2025)
Published: (2025)
COMPARISON OF POTENTIAL ENVIRONMENTAL IMPACTS ON THE PRODUCTION AND USE OF HIGH AND LOW SULFUR REGULAR DIESEL BY LIFE CYCLE ASSESSMENT
by: Aldemar Martínez-González
Published: (2011)
by: Aldemar Martínez-González
Published: (2011)
CLIMATIZING EVERYTHING: FROM ENVIRONMENTALISM TO THE LEGAL WORLD, OLD AND NEW POWER STRATEGIES IN SOCIO-ENVIRONMENTAL CONFLICTS
by: Losekann, Cristiana, et al.
Published: (2024)
by: Losekann, Cristiana, et al.
Published: (2024)
THE IMPACT OF THE MERGER WITH SYNDICATE BANK ON CANARA BANK'S PROFITABILITY
by: Dr. S. CHAND BASHA
Published: (2025)
by: Dr. S. CHAND BASHA
Published: (2025)
WORLD BANK: New Grants and Loans
Published: (2025)
Published: (2025)
WORLD BANK: New Grants and Loans
Published: (2025)
Published: (2025)
WORLD BANK: New Grants and Loans
Published: (2025)
Published: (2025)
WORLD BANK: New Grants and Loans
Published: (2024)
Published: (2024)
WORLD BANK: New Grants and Loans
Published: (2024)
Published: (2024)
WORLD BANK: New Grants and Loans
Published: (2024)
Published: (2024)
WORLD BANK: New Grants and Loans
Published: (2024)
Published: (2024)
WORLD BANK: New Grants and Loans
Published: (2025)
Published: (2025)
WORLD BANK: Africa Summit (Nairobi)
Published: (2024)
Published: (2024)
LIFE CYCLE ASSESSMENT OF A TRADITIONAL BRICK MANUFACTURE IMPROVEMENT
by:
Published: (2019)
by:
Published: (2019)
LIFE CYCLE ASSESSMENT OF A TRADITIONAL BRICK MANUFACTURE IMPROVEMENT
by: Héctor Alfredo López-Aguilar
Published: (2019)
by: Héctor Alfredo López-Aguilar
Published: (2019)
LIFE CYCLE ASSESSMENT (LCA) AS A TOOL FOR BUSINESS STRATEGY
by: Rodrigo Salvador
Published: (2014)
by: Rodrigo Salvador
Published: (2014)
AI-DRIVEN CREDIT RISK ASSESSMENT IN BANKING AT ICICI BANK
by: Journal of Digital Engineering and Business Management
Published: (2026)
by: Journal of Digital Engineering and Business Management
Published: (2026)
ECOLOGICAL RISK ASSESSMENT IN THE FUNCTION OF ENVIRONMENTAL PROTECTION
by: Saša T. Bakrač
Published: (2012)
by: Saša T. Bakrač
Published: (2012)
COMBINED OPTIMAL TAP SETTING AND REACTIVE POWER INJECTION FOR LOSS REDUCTION IN DISTRIBUTION SYSTEMS
by: Mauricio Granada Echeverri
Published: (2014)
by: Mauricio Granada Echeverri
Published: (2014)
THE POWER OF CITIZENS WORKING TOGETHER IN A DIVIDED WORLD
Published: (2025)
Published: (2025)
INFLUENCES OF THE WORLD BANK GROUP GUIDELINES ON TEACHER TRAINING POLICY IN ANGOLA
by: Fernandes da Silva Santos, Thiago Rodrigo, et al.
Published: (2025)
by: Fernandes da Silva Santos, Thiago Rodrigo, et al.
Published: (2025)
INTRODUCTORY BACKGRO UND FOR LIFE CYCLE ASSESSMENT (LCA) OF PURE SILK FABRIC
by: Silvia Mara Bortoloto Damasceno Barcelo
Published: (2013)
by: Silvia Mara Bortoloto Damasceno Barcelo
Published: (2013)
COMPARISON OF LIFE CYCLE ASSESSMENT TOOLS: GLOBAL WARMING POTENTIAL IN STEEL PRODUCTS
by: Beatriz S. Bandarra, et al.
Published: (2026)
by: Beatriz S. Bandarra, et al.
Published: (2026)
LIFE CYCLE ASSESSMENT OF LOW CARBON SANDWICH PANELS WITH WOOD FIBRE CORE
by: Luana Tesch, et al.
Published: (2024)
by: Luana Tesch, et al.
Published: (2024)
ASPECTS ABOUT THE WORLD OF WORK PRESENTED IN LIFE PROJECT TEXTBOOKS
by: Achterberg, Guilherme Baumann, et al.
Published: (2023)
by: Achterberg, Guilherme Baumann, et al.
Published: (2023)
THE IMPACT OF ESG FACTORS ON A BANK'S RISK MANAGEMENT SYSTEM
by: Tuychiyeva Madina Gafarovna
Published: (2025)
by: Tuychiyeva Madina Gafarovna
Published: (2025)
POTENTIAL AND ECONOMIC FEASIBILITY OF A WIND POWER PLANT IN CIUDAD JUÁREZ, MEXICO
by: Yashar Aryanfar
Published: (2022)
by: Yashar Aryanfar
Published: (2022)
RELEVANCE OF STRATEGIC ENVIRONMENTAL ASSESSMENT TO RIO GRANDE BASIN MANAGEMENT
by: Patrícia Andressa de Ávila
Published: (2018)
by: Patrícia Andressa de Ávila
Published: (2018)
ASSESSMENT CRITERIA AND APPROACHES IN PROJECT-BASED EDUCATION: THE EXAMPLE OF MUSIC LESSONS
by: Rakhimov, Alisher
Published: (2025)
by: Rakhimov, Alisher
Published: (2025)
THE IMPACT OF GLOBALIZATION ON ECONOMIC DEVELOPMENT IN THE MODERN WORLD
by: Uktamova Sevinch Sherzod kizi, et al.
Published: (2026)
by: Uktamova Sevinch Sherzod kizi, et al.
Published: (2026)
Similar Items
-
Table 1 in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
by: NEWAZ, M. N.
Published: (2010) -
Table 4.10 in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
by: NEWAZ, M. N.
Published: (2010) -
Table- 1.3. List of Reptiles in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
by: NEWAZ, M. N.
Published: (2010) -
Table- 1.4. List of Amphibians in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
by: NEWAZ, M. N.
Published: (2010) -
Figure-2.1. Steps Involved in Environmental Clearance in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
by: NEWAZ, M. N.
Published: (2010)