Decision criteria to select a suitable criticality assessment technique
Fuente:
Zenodo
Gespeichert in:
| Hauptverfasser: | , , , , |
|---|---|
| Format: | Recurso digital |
| Sprache: | Englisch |
| Veröffentlicht: |
Zenodo
2018
|
| Schlagworte: | |
| Online-Zugang: | |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| _version_ | 1866901051500658688 |
|---|---|
| author | Viveros, Pablo Crespo Márquez, Adolfo Barberá-Martínez, Luis González-Prida Díaz, Vicente Kristjanpoller, Fredy |
| author_facet | Viveros, Pablo Crespo Márquez, Adolfo Barberá-Martínez, Luis González-Prida Díaz, Vicente Kristjanpoller, Fredy |
| contents | <p>The article presents a decision criterion for selecting the most appropriate criticality assessment technique for industrial operations, based on factors such as safety, environment, production, costs, failure frequency, and mean time to repair. It includes a methodology applied in a copper treatment plant in Chile, identifying the RPN technique as the most suitable for the context analyzed.</p> |
| format | Recurso digital |
| id | zenodo_https___doi_org_10_6036_8666 |
| institution | Zenodo |
| language | eng |
| publishDate | 2018 |
| publisher | Zenodo |
| record_format | zenodo |
| spellingShingle | Decision criteria to select a suitable criticality assessment technique Viveros, Pablo Crespo Márquez, Adolfo Barberá-Martínez, Luis González-Prida Díaz, Vicente Kristjanpoller, Fredy Criticality assessment Industrial maintenance Decision criteria Risk management <p>The article presents a decision criterion for selecting the most appropriate criticality assessment technique for industrial operations, based on factors such as safety, environment, production, costs, failure frequency, and mean time to repair. It includes a methodology applied in a copper treatment plant in Chile, identifying the RPN technique as the most suitable for the context analyzed.</p> |
| title | Decision criteria to select a suitable criticality assessment technique |
| topic | Criticality assessment Industrial maintenance Decision criteria Risk management |
| url | https://doi.org/10.6036/8666 |